SSP126, Mollweide projection (1 Realization)
Projected change in temperature relative to the period 1995-2014 for the optimistic scenario SSP126 as simulated with MPI-ESM HR.
SSP245, Mollweide projection (Ensemble mean of 2 realizations)
Projected change in temperature relative to the period 1995-2014 for scenario SSP245 as simulated with MPI-ESM HR.
SSP370, Mollweide Projection (Ensemble mean of 10 Realizations)
Projected change in temperature relative to the period 1995-2014 for scenario SSP370 as simulated with MPI-ESM HR.
SSP585, Mollweide projection (1 Realization)
Video: Projected change in temperature relative to the period 1995-2014 for the pessimistic scenario SSP585 as simulated with MPI-ESM HR.